Egilabria #2 Well
Below is a Schematic of the Egilabria #2 vertical and lateral (Sub horizontal) wells.
During the drilling vertical section of the well several zones encountered gas. Some were flared at the surface . Below is. a table of the gas intersections and flare sizes encountered in the vertical well only (See Orange highlighted).
The Lateral section was approx 580m long and was frac'ed 8 times. Last report from the company a few weeks ago was that fracc'ing fluid continues to be returned to the surface and that they were expected to flow test the Frac'ed well by around about 3 week of Oct (ie, About now).
Core Sample taken from the Lawn shale and put into containment canisters reportedly returned gas pressure of 70psi.
Add to My Watchlist
What is My Watchlist?