MAURITANIA DRILLING PROGRAMME
WEEKLY PROGRESS REPORT
PAGES: 2
Hardman Resources Limited (“Hardman”) provides the following progress report on its
Mauritania offshore activities:
PSC Area B: Tevét-2 ST1 Appraisal / Exploration Well
Since the last report on 11 October 2005 the ‘Stena Tay’ drilling rig has sidetracked the Tevét-2
borehole from 3,048 metres. An 8-1/2” hole section was drilled to the 7” casing point at
3,667 metres. At midnight on the 17 October preparations had begun to drill the 6-1/2” hole
through the Cretaceous section, inclusive of the lithology at 3,741 metres at which the original
borehole took a kick. The planned total depth (TD) of 3,965 metres remain unchanged.
The Tevét-2 well is located 2.5 kilometres to the South of the Miocene discovery well Tevét-1,
and lies in a water depth of 466 metres.
- Forums
- ASX - By Stock
- HDR
- update-mauritania drilling programme
HDR
hardman resources limited
update-mauritania drilling programme
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HDR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online