IVZ 1.41% 7.2¢ invictus energy ltd

Update on discussion with Scott, page-81

  1. 1,249 Posts.
    lightbulb Created with Sketch. 120
    Thanks Navarone

    Only got as far as inserting your co-ordinates for all three rig sites on Googlemaps

    https://www.google.com/maps/@-16.3185076,30.9529094,265693m/data=!3m1!1e3?entry=ttu

    Satellite view indistinct

    Anyone got a better map/satellite map yet ?

    Incidentally - this appeared on Googlemaps about Baobab Rig Site "Under Construction" in October 2022 !! :

    https://www.energy-pedia.com/news/zimbabwe/invictus-energys-cabora-bassa-basin-margin-area-holds-1-2-billion-barrel-prospective-oil-resource-189259


    viz: The Baobab-1 wellpad construction is underway and scheduled for completion to allow for the rig move and subsequent drilling to commence immediately following the completion of the Mukuyu-1 well, which spudded on 23 September and is prognosed to take approximately 50 to 60 days to drill and evaluate.

    Was it done/completed ?

    I missed it !!

    Thanks - Oilf.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.