This is unbelievable and unacceptable.
As i understand it this is the initial main ore grinding unit, at the start of the process.
Any competent mechanical and electrical engineer could specify the correctly rated electric motor for the equipment capacity and ore load.
As stated whoever designed this plant could be sued for losses.This is basic engineering.Should not happen.
Very disappointing and will affect the share price.
I think BJ must be pulling his hair out.
As someone else stated the delay in aquiring a new motor is also puzzling.
- Forums
- ASX - By Stock
- update on las lagunas project
This is unbelievable and unacceptable.As i understand it this is...
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAU (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $2.99M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $5.734K | 1.491M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
50 | 67252335 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 12024801 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
41 | 43855592 | 0.003 |
13 | 12864980 | 0.002 |
8 | 23859950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 12024801 | 14 |
0.005 | 9115176 | 8 |
0.006 | 2018106 | 4 |
0.007 | 1312436 | 3 |
0.008 | 1277307 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online