    Below is a few reasons for the long drilling times as accounted by Sorochynska well #201. Taken from HOG June2010.

    The planned well depth is 4,250
    metres.

    At these depths, the drilling rates have been slower than expected due to lack of pump pressure.

    The pumps are being continuously repaired as there are long lead times (50-60 days delivery time) to
    obtain new and reconditioned pumps.

    Drilling rates with the down-hole motor driven bit have been around 4 metres per hour. With
    conventional drilling, the Company is only achieving about 1 metre/hr. Routine repairs to the pumps
    will continue.


    - Sounds like tough drilling in this basin.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.