do some research NOCASH or stop your downramp.
The process takes time for heavens sake.
For eaxample, not relating to this project but this is common when researching the process.
Immediately following completion of the frac job, formation pressure causes the water used as part of the frac fluid to come back out of the well at a rate of 100 to 150 bbl per hour. The volume of this "flow-back water" declines over time. It is collected in 500-bbl frac tanks and is either reused or disposed of.
do some research NOCASH or stop your downramp.The process takes...
Add to My Watchlist
What is My Watchlist?