RIA 0.00% 3.3¢ rialto energy limited

update , page-8

  1. 1,957 Posts.
    Latest announcement states drill pipe freed to 870 metres and cement plugged. Not sure how far above the drill pipe cement plug was completed. I recieved an email from PR stating drilling recommenced at 650 metres, however the fact that we are at 1300m indicates we may have started side track from a deeper level.
 
watchlist Created with Sketch. Add RIA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.