Latest announcement states drill pipe freed to 870 metres and cement plugged. Not sure how far above the drill pipe cement plug was completed. I recieved an email from PR stating drilling recommenced at 650 metres, however the fact that we are at 1300m indicates we may have started side track from a deeper level.