SBR 7.14% 1.3¢ sabre resources limited

update, page-13

  1. 1,655 Posts.
    "what is the cost to produce the JORC?"

    Inferred, indicated or measured?

    For their 400m strike, not much more for an inferred would be my guess unless they intend to re-drill below 100m.

    They didn't take long to drill the 5 Eisernenhut holes.

    If you want to wait for the next CR, you might have to wait another 6m. They don't have to drill all the way back to Kombat to produce a JORC compliant resource estimate.

    Sutto says that their model is already predicting the location of the deposit. Confidence levels is what it is all about.

 
watchlist Created with Sketch. Add SBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.