Cdchi,
reckon it is still too early to tell what might be the first stage reserve figure with all the variables outstanding:-
infill/extension drilling on a number of different prospects-these results will then impact on the size of plant required,
then there is the cost/size of the plant and the economies of scale that will generate (eg bigger plant/higher capex vrs lower opex-and hence the added ability to treat dirt they may have been only marginal originally),
plant location (presume Aldiss) and the trucking/rehandling costs,
then the 'wild card'-impact of any additional acquisitions.
Note the net effect of all of the above tend to be positive side of the ledger in terms of outlook IMO.
The next three/four months will be interesting.
Cheers,TAS
- Forums
- ASX - By Stock
- update
Cdchi,reckon it is still too early to tell what might be the...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)