Last update was on Monday. It stated they were at 4,650m and seeing sandy returns. It sounded as if the ROP at this point was favourable. They were pulling out to run a new bit with LWD tools and rig maintenance.
So following these activities, there was only 50 odd metres to drill before hitting the Kingia target.
I’d suspect the above activities were maybe up to 48 hrs work - assuming no hiccups. Which should mean they’re back on bottom.
The drilling rate may be favourable in the Kingia, but after that is the bit basher shale. That will be very slow going.
As far as a TH, not sure if they’ll have one while drilling. Especially if the LWD is only logging (not live data - I’m not an expert on them). What are others thoughts here?
- Forums
- ASX - By Stock
- Update
Last update was on Monday. It stated they were at 4,650m and...
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $629.6M |
Open | High | Low | Value | Volume |
22.0¢ | 22.5¢ | 21.5¢ | $1.075M | 4.892M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 491938 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 41858 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 491938 | 0.215 |
15 | 725246 | 0.210 |
8 | 793671 | 0.205 |
22 | 797127 | 0.200 |
28 | 1200716 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 41858 | 1 |
0.225 | 401921 | 9 |
0.230 | 1009669 | 16 |
0.235 | 499877 | 12 |
0.240 | 930058 | 14 |
Last trade - 16.10pm 30/04/2024 (20 minute delay) ? |
|
|||||
Last
22.0¢ |
  |
Change
0.000 ( 0.23 %) |
|||
Open | High | Low | Volume | ||
22.5¢ | 22.5¢ | 21.5¢ | 1288173 | ||
Last updated 16.05pm 30/04/2024 ? |
Featured News
STX (ASX) Chart |