G58 - you might remember me from other Oilers such as Pancon etc over the years. And others that I prefer to well forget like the old AYO.
My thinking with ERH is that they would be unlikely to release anything about field size until they have conducted the flow test? And then if the flow is OK review and formulate a developmental drilling program.
At what point would the Operator even consider releasing an updated field size estimate?
In the ERH Mercury Report the consultants includes estimates of OIP and therefore recoverable sourced from the Operator - but there was no information concerning possible high-medium-low OIP estimates that will often be quoted pre-drill for wells drilled in Aust for example.
- Forums
- ASX - By Stock
- ERH
- update
update, page-58
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)