No timeline given in the SS announcement. Statement regarding timeline was pretty open ended unlike previous statements, see below.
Simulus and BWHC are continuing with their work to upgrade the study to a Pre-Feasibility Study standard, improving accuracy to ±25%. These results will then be combined with the December 2019 TECH PFS to present the financial metrics of the overall project when producing HPA instead of aluminium hydroxide.
PM1 Price at posting:
1.8¢ Sentiment: Buy Disclosure: Held