1. Revenue/t:
Deposit avg 22% ZnEq. At current zn pxs were talking about $680/t rock. Using conservative recovery and TC/RC assumptions, let's say revenues $430/t mined.
2. Cost/t:
Max $80/t site costs for underground mining. Assuming decline access then room & pillar at depth. Most of the deposit is actually at open pittable depths but likely high strip ratio due to deposit dipping 50-60 degrees.
3. Throughput:
1500tpd * 360 days = 540ktpa
4. Cash flow:
540ktpa * ($430/t - $80/t) = US$189m p.a.
5. Value:
Fully Diluted EV @ A$0.47/sh = US$45m...
US$45m vs. US$189m per annum
- Forums
- ASX - By Stock
- Updated Resource Estimate (based on current results)
1. Revenue/t: Deposit avg 22% ZnEq. At current zn pxs were...
-
-
- There are more pages in this discussion • 743 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.64 |
Change
0.050(1.93%) |
Mkt cap ! $733.9M |
Open | High | Low | Value | Volume |
$2.66 | $2.69 | $2.59 | $1.932M | 730.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 7932 | $2.64 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.65 | 10925 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 10053 | 2.640 |
19 | 14643 | 2.630 |
16 | 15644 | 2.620 |
13 | 27823 | 2.610 |
11 | 11225 | 2.600 |
Price($) | Vol. | No. |
---|---|---|
2.650 | 9761 | 22 |
2.660 | 19406 | 18 |
2.670 | 10332 | 11 |
2.680 | 19394 | 8 |
2.690 | 8498 | 6 |
Last trade - 13.43pm 09/08/2024 (20 minute delay) ? |
Featured News
ADT (ASX) Chart |