1. Revenue/t:
Deposit avg 22% ZnEq. At current zn pxs were talking about $680/t rock. Using conservative recovery and TC/RC assumptions, let's say revenues $430/t mined.
2. Cost/t:
Max $80/t site costs for underground mining. Assuming decline access then room & pillar at depth. Most of the deposit is actually at open pittable depths but likely high strip ratio due to deposit dipping 50-60 degrees.
3. Throughput:
1500tpd * 360 days = 540ktpa
4. Cash flow:
540ktpa * ($430/t - $80/t) = US$189m p.a.
5. Value:
Fully Diluted EV @ A$0.47/sh = US$45m...
US$45m vs. US$189m per annum
- Forums
- ASX - By Stock
- Updated Resource Estimate (based on current results)
1. Revenue/t: Deposit avg 22% ZnEq. At current zn pxs were...
-
-
- There are more pages in this discussion • 743 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.91 |
Change
-0.070(1.76%) |
Mkt cap ! $1.105B |
Open | High | Low | Value | Volume |
$3.97 | $3.98 | $3.91 | $268.0K | 67.95K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 576 | $3.91 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.92 | 4620 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 21837 | 3.930 |
8 | 4731 | 3.920 |
8 | 5008 | 3.910 |
7 | 4989 | 3.900 |
7 | 9406 | 3.890 |
Price($) | Vol. | No. |
---|---|---|
3.940 | 6603 | 12 |
3.950 | 7568 | 9 |
3.960 | 10661 | 12 |
3.970 | 15393 | 10 |
3.980 | 12256 | 11 |
Last trade - 10.11am 27/06/2024 (20 minute delay) ? |
Featured News
ADT (ASX) Chart |