@cobra327 True to my word I emailed and CN gave me a basic [ that's me ] run down on how it works.
It is possible to move the prospective resource to contingent with 1 well provided what they see on the 3D is what they encounter when drilling.
My assumption from that is if the reservoir is in line with the 3D after drilling that the full prospective resource number can be moved to contingent....assuming we hit oil!
Fingers crossed. DB
- Forums
- ASX - By Stock
- FAR
- Upstream article
Upstream article, page-106
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
49.0¢ |
Change
0.005(1.03%) |
Mkt cap ! $45.28M |
Open | High | Low | Value | Volume |
49.0¢ | 49.5¢ | 49.0¢ | $14.68K | 29.95K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12053 | 49.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.0¢ | 867 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12053 | 0.490 |
1 | 18945 | 0.485 |
1 | 50000 | 0.480 |
1 | 2100 | 0.475 |
1 | 42553 | 0.470 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 867 | 1 |
0.505 | 30348 | 3 |
0.510 | 69630 | 3 |
0.515 | 3257 | 1 |
0.520 | 333616 | 7 |
Last trade - 13.58pm 19/11/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |