Another key aspect of KZL that has not been discussed much is their existing north Qld base metal portfolio. If the Mungana Plnat is ever finished and Thalanga processes poly metallic ore from Waterloo and Lionore, the north Qld operation could be producing up to 150KT of ZN and over 30 KT of CU annually. This is equivalent a 50% stake in Admiral Bay.
- Forums
- ASX - By Stock
- upward trend 1.50 next stop
Another key aspect of KZL that has not been discussed much is...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)