................................. You should have known that FD4 was on a restricted rate flowback to achieve higher EURs.
FRANCES DILWORTH NO. 4H RESTRICTED RATE FLOWBACK PROCEEDING TO SCHEDULE Project: Yellow Rose Well: Frances Dilworth Nos. 4H, 5H and 6H Working Interest: 75% Location: McMullen County, Texas Operator: San Isidro Development Company (25%) Antares is pleased to announce the flowback of the 15 stage hydraulic fracture stimulation of the Frances Dilworth No. 4H is proceeding according to schedule with the well continuing to clean-up. This well is utilizing a restricted rate flowback technique where the well is allowed to flow through a smaller choke in an effort to maintain reservoir pressure allowing for greater ultimate recoveries. The Frances Dilworth No. 4H was the first fracture stimulation to utilize 100% higher strength ceramic and bauxite proppants. Higher strength proppants pumped in higher concentrations allow for oil to more easily enter the borehole.
AZZ Price at posting:
46.0¢ Sentiment: Buy Disclosure: Held