ARU 0.00% 13.0¢ arafura rare earths ltd

You missed one of the key ex-China suppliers coming online in...

  1. 278 Posts.
    lightbulb Created with Sketch. 213
    You missed one of the key ex-China suppliers coming online in 2026 (and that is a guaranteed online time given they are balls deep in construction right now) - Eneabba. Below their NdPr production profile, but capacity to push out 5.5 ktpa in the plant with offtakes. I'd imagine as they get closer to build date they will firm up offtakes to get to 5.5 ktpa. Assuming they get half the offtakes in place (not like there is a shortage of monazite feedstock around!) and they push out 4 ktpa NdPr your charting looks like the below.

    https://hotcopper.com.au/data/attachments/6231/6231533-3b6b09355daa30aa407b574ece8abfad.jpg

    https://hotcopper.com.au/data/attachments/6231/6231536-a47b1db1c789126f177326bbf94b049f.jpg

    It looks like ex-China supply is covered well until 2029 at least thanks to Eneabba. Meteoric also stated they are planning for first production in 2028, that's another 2.5 ktpa NdPr oxide roughly coming along ex-China, there's also plenty of other quick to come online clay projects like VMM & ARA:TSX potentially in the mix. Serra Verde may also ramp up through the next 5 years. So a few different supply points to factor into the above modelling. Maybe if you add a likelihood factor % against each ptoential supply source ktpa that would cover them all well.
 
watchlist Created with Sketch. Add ARU (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
0.000(0.00%)
Mkt cap ! $320.3M
Open High Low Value Volume
13.0¢ 13.5¢ 12.5¢ $411.5K 3.150M

Buyers (Bids)

No. Vol. Price($)
54 2891858 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 170510 5
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
ARU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.