The need to trial one in Hawaii may not be necessary, unless of course there are specific requirements for that location. By 2016, CWE should be close to deploying CETO 6 actuators in Perth and Cornwall. These locations can serve as the cellar door for anyone wanting to have a look at the product saving them the cost of setting one up over there.
Add to My Watchlist
What is My Watchlist?