1m bpd is a long time away, and depends a lot on how sucessful the 20,000bpd plant is, and how much coal either Linc or its MOU partners can prove up. If the scale up from 20 to 20,000bpd works, then the sky's the limit. But we are looking at another 2-2.5 years before that happens right?
- Forums
- ASX - By Stock
- us roadshow presentation
1m bpd is a long time away, and depends a lot on how sucessful...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)