For the late bloomers to this stock, some facts to ponder on.
SS-10 well (the much talked about on this forum) was the first well drilled on SS field in 25 years last year Aug-Sept. It flow tested 52 MMCFD, this could increase to 55MCFD on production.
This well will take the prodn from the SS field to a total of 200 MMcfd from 6 wells alone.
For the Sept 2007 quarter, total of 2416 mmcfd gas was sold by ORCA. Gas to power grid cost was US $2.19/mcf.
The current configuration of the SS Gas processing plant limits gas supply to 70 MMCFD.
- Forums
- ASX - By Stock
- KEY
- valuation and background
valuation and background, page-11
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $116 | 116.0K |
Featured News
KEY (ASX) Chart |