Looking further into the solicitation it indicates this:
QUANTITY
30
LOW RATE INITIAL PRODUCTION – SYSTEM
Mission Payload Module – Engineering, Manufacturing & Development Phase
Manufacture and deliver the Mission Payload Module - Non-Lethal Weapon System (MPM-NLWS) system the Low Rate Initial Production Phase. It includes the requirements for program management, meetings and reviews, system engineering, testing and verification, technical documentation, environmental, safety, and occupational health, configuration management, software, and contractor performance measurement.
1,500 Each
OPTION LOW RATE INITIAL PRODUCTION – MUNITIONS
Mission Payload Module – Low Rate Initial Production
Manufacture and deliver the Mission Payload Module FFP
LOW RATE INITIAL PRODUCTION – SYSTEM (OPTION) - Non-Lethal Weapon System (MPM-NLWS) muntion through the Low Rate Initial Production Phase. It includes the requirements for program management, meetings and reviews, system engineering, testing and verification, technical documentation, environmental, safety, and occupational health, configuration management, software, and contractor performance measurement
Looking further into the solicitation it indicates this:QUANTITY...
Add to My Watchlist
What is My Watchlist?