The revenue would be $1050 per tonne of DUST. Since the operating cost is per tonne ZINC, and the dust is around 50% Zn, the profit would be more like $800-850 per tonne DUST (feel free to check the maths!!)
APG Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held