AAU 25.0% 0.3¢ antilles gold limited

value, page-11

  1. 13,575 Posts.
    lightbulb Created with Sketch. 567
    As McSheath says the ratio of Au/Ag in the bars is now very close to expected.Its the overall dore' production that is now being ramped up.It appears earlier in the piece they were not getting expected silver recovery.

    A slight correction to what I previously assumed was to be the case with dore' production and that is that the increase from 120Kg to 200Kg were both to be achieved over approx 2 week periods so we are still only seeing around 100Kg/week of dore' in the last week of August IF all is going to plan according to the last annmnt.The designed output calls for 380Kg/week and was to take between 2-3 months to achieve.I believe we have now passed through the 4-5 week period and if we get confirmation of the 200Kg being shipped it must be relatively safe to assume that its going to take the full 3 months to achieve 380Kg/week.

    Given how difficult it can be to upsize a new process to production it will be admirable if PGI can achieve above 350Kg dore'/week and hence around a 10% higher cost of production than the stated $340/Oz.Still very cheap compared to the likes of Newcrest who have average production costs near twice this.

    I have watched several upsizings of new processes and rarely do recoveries reach pilot plant levels.Dont get me wrong Id love to be disproved!

    d.

 
watchlist Created with Sketch. Add AAU (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(25.0%)
Mkt cap ! $4.384M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $53.93K 16.60M

Buyers (Bids)

No. Vol. Price($)
57 64172874 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 100771507 41
View Market Depth
Last trade - 16.10pm 18/09/2024 (20 minute delay) ?
AAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.