I like this bit,
Initial well is targeting the most northerly of three prospective fault blocks with multiple objectives (Het 1A, 1, 2A and 2). The most likely resource potential of the initial fault block assumes 100ft of pay over 545 acres and is estimated to be 110BCFG with 3.3MMBC (upside potential of 185BCFG and 5.5MMBC). If successful, the project offers substantial cash flow, long life reserves which will have a substantial impact on the company with additional reserve potential in the southerly fault blocks.
- Forums
- ASX - By Stock
- vermilion river
I like this bit,Initial well is targeting the most northerly of...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $8.576M |
Open | High | Low | Value | Volume |
0.3¢ | 0.4¢ | 0.3¢ | $555 | 172.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 9164520 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 3561124 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 8997854 | 0.003 |
12 | 7533675 | 0.002 |
10 | 11200009 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 3561124 | 6 |
0.005 | 6054097 | 18 |
0.006 | 2985166 | 3 |
0.007 | 1563480 | 2 |
0.008 | 1041884 | 3 |
Last trade - 14.02pm 01/11/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |