Did anyone else notice that the Rab. vertical drilling went to 4600 metres, 75 metres further than estimated (4525m)? hope it means we are looking at a bigger reservoir. logging results of this vertical section should be known soon (by the end of the week?)
Add to My Watchlist
What is My Watchlist?