Did anyone else notice that the Rab. vertical drilling went to 4600 metres, 75 metres further than estimated (4525m)? hope it means we are looking at a bigger reservoir. logging results of this vertical section should be known soon (by the end of the week?)
Did anyone else notice that the Rab. vertical drilling went to...
Add to My Watchlist
What is My Watchlist?