I reckon they will need tops $2.5m for drilling Aje-5 and completing Aje-4 for production. Thats a gross cost of around $50m which should be feasible if they get a good rig. Afren have drilled their well on the block next door (Ogo-1) fairly quickly (sure this is not a horizontal producer) so drilling producers will take longer but if they get a good rig, I wouldn/t think would need more than $50m gross to get the EPS up and running.
- Forums
- ASX - By Stock
- vg ... but cash ?
I reckon they will need tops $2.5m for drilling Aje-5 and...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JKA (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online