Maybe Dan the Man will reinstate the East West link project as one of the inevitable future stimulous projects. The cost of scrapping the East West link previously was only $1.1 billion.
"The total cost of the termination settlement will be $642 million, despite Premier Daniel Andrews' election pledge that the contract could be ripped up at no cost because it was not worth the paper it was written on."