Maybe Dan the Man will reinstate the East West link project as...

  1. 2,450 Posts.
    lightbulb Created with Sketch. 129
    Maybe Dan the Man will reinstate the East West link project as one of the inevitable future stimulous projects. The cost of scrapping the East West link previously was only $1.1 billion.

    "The total cost of the termination settlement will be $642 million, despite Premier Daniel Andrews' election pledge that the contract could be ripped up at no cost because it was not worth the paper it was written on."
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.