https://www.africaoutlookmag.com/outlook-features/langer-heinrich-uranium
I’m new to all of this but the above link would suggest there were only feasibility studies conducted prior to 2005 when Stage 1 construction commenced. The article states 20 months to build Stage 1. However if first production for Deep Yellow is from Omahola then there would likely be a different process employed than at LH (heap leaching which was being assessed for Stage 4 expansion of LH - see following link). So what I’m getting at is that the time to get to Stage 1 of LH (20 months) might not be indicative of initial construction time for Deep Yellow. However, if it is, then to get to the stage of first production we would also need to add to the 20 months construction time additional time for an initial feasibility study (borrowing off Paladin studies perhaps?) and time for initial processing assuming mining gets underway in parallel.
http://www.world-nuclear.org/information-library/country-profiles/countries-g-n/namibia.aspx
- Forums
- ASX - By Stock
- DYL
- Video from Sprott Conference
Video from Sprott Conference, page-10
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DYL (ASX) to my watchlist
|
|||||
Last
97.5¢ |
Change
0.040(4.28%) |
Mkt cap ! $945.1M |
Open | High | Low | Value | Volume |
99.0¢ | 99.0¢ | 96.5¢ | $4.439M | 4.551M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 23403 | 97.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
98.0¢ | 104081 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 6149 | 0.975 |
3 | 38395 | 0.970 |
3 | 105024 | 0.965 |
6 | 103016 | 0.960 |
3 | 42080 | 0.955 |
Price($) | Vol. | No. |
---|---|---|
0.980 | 104081 | 5 |
0.985 | 49232 | 4 |
0.990 | 74756 | 6 |
0.995 | 189455 | 3 |
1.000 | 74800 | 6 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
DYL (ASX) Chart |