I like the mine plan has been designed to make as much cashflow up front? Really?
-With current LOM, pits are only 50m deep on average main pit is 130m deep
-Current 7 year LOM has 3.9m oz outside to it currently doing studies on!
-Production 6 months, in June/July, by Jan should have 2 quarters under the belt!
Happy Days