I like the mine plan has been designed to make as much cashflow up front? Really?
-With current LOM, pits are only 50m deep on average main pit is 130m deep
-Current 7 year LOM has 3.9m oz outside to it currently doing studies on!
-Production 6 months, in June/July, by Jan should have 2 quarters under the belt!
Happy Days
- Forums
- ASX - By Stock
- WMC
- Video: Interview with Managing Director, Bryan Dixon to discuss the DFS results
Video: Interview with Managing Director, Bryan Dixon to discuss the DFS results, page-6
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)