According to the 4th April 2022 announcement, Stage 1 ( in red colour below ) will have : 12 evaporation ponds on Strings 1 & 2 1 evaporation pond on String 3 6 muriate ponds
Week 44 Wrap: Relatively boring week ahead of US election; HotCopper's most watched; Oz inflation at 3.5%
MKT The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint