I sent mr adrah Hobbs pipe 1 diagram to mate of mine who worked in Florida canyon mine... guys used to high grade underground material and even he said if soc 800metres at 1.2 or 1.3 grams per tonne it is very huge discovery... I asked about production and he said block caving all the way and that capex the hurdle not opex as it is nearly as cheap as open cut in some places cheaper... now I don't believe everything so called experts say on here...he said huge tonnage lifts they do would make mining this stuff very cheap ONCE capex paid for... why worry we won't wait that long we just prove many million ounce in pipe 1 and then sell to a Rio and Newcrest or Chinese for $$$ and walk away...
- Forums
- ASX - By Stock
- visual structure
I sent mr adrah Hobbs pipe 1 diagram to mate of mine who worked...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SOC (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.89M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 10.0¢ | $5K | 50K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 38064 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 50000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38064 | 0.098 |
2 | 227222 | 0.090 |
1 | 80000 | 0.081 |
1 | 13902 | 0.072 |
1 | 200000 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 50000 | 2 |
0.110 | 22205 | 1 |
0.120 | 12545 | 1 |
0.130 | 97482 | 2 |
0.150 | 700000 | 3 |
Last trade - 13.43pm 03/10/2024 (20 minute delay) ? |
Featured News
SOC (ASX) Chart |