VML 20.0% 0.4¢ vital metals limited

" Nahanni Construction will undertake mining and crushing during...

  1. 7,019 Posts.
    lightbulb Created with Sketch. 581
    " Nahanni Construction will undertake mining and crushing during a single campaign between March and September 2021. Mined ore will be stockpiled for use in ore sorting operations during the summer periods of 2021-2023 by Cheetah personnel. It is anticipated that a 2nd mining campaign will be required in 2024 to replenish stockpiles. "

    I would imagine management has calculated, the ore sorting operations 2021-2023, transportation of 35% rare earth ore, from the ore sorter, to Saskatoon will be enough raw material to keep the Extractor in operation producing mixed rare earth carbonate until after 2024 when they anticipate the 2nd mining campaign.

    Once the Extractor is in full operation, which it will be before 2024 and working to capacity, any extra feed stock will not be able to be processed unless they build another Extractor.

    The choice of where the next mining campaign will be in 2024 could come down to where the best value ore is.
    That could be the real benefit of the stage 2 drilling recently commenced.

 
watchlist Created with Sketch. Add VML (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $23.58M
Open High Low Value Volume
0.5¢ 0.5¢ 0.3¢ $77.63K 19.33M

Buyers (Bids)

No. Vol. Price($)
62 48196131 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 13368362 9
View Market Depth
Last trade - 16.10pm 07/05/2024 (20 minute delay) ?
Last
0.4¢
  Change
-0.001 ( 20.0 %)
Open High Low Volume
0.4¢ 0.4¢ 0.4¢ 16364520
Last updated 15.59pm 07/05/2024 ?
VML (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.