The drilling only finished around the 15th of December, so just over a month ago, including Christmas/New Year.
I would expect the lab were shutdown over the break and possibly backed up a bit.
The announcement on the 19th Dec says the final Towerana results were expected mid-Jan. Those would have been with the lab before the Blue Moon ones, I'd say. So if they aren't out yet, it would suggest a backlog.
Maybe the two will come together?
As long as the results are out before Aus Day, I don't think it's been particularly slow, all things considered.
- Forums
- ASX - By Stock
- DEG
- Volume drying up
Volume drying up, page-9
-
- There are more pages in this discussion • 83 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.39 |
Change
0.045(3.36%) |
Mkt cap ! $3.319B |
Open | High | Low | Value | Volume |
$1.37 | $1.41 | $1.35 | $14.07M | 10.18M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 55057 | $1.39 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.40 | 6000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6920 | 1.385 |
2 | 6249 | 1.380 |
3 | 66270 | 1.370 |
1 | 8971 | 1.365 |
2 | 18971 | 1.360 |
Price($) | Vol. | No. |
---|---|---|
1.395 | 6000 | 2 |
1.400 | 29971 | 5 |
1.405 | 24328 | 5 |
1.410 | 105971 | 6 |
1.415 | 40971 | 4 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
DEG (ASX) Chart |