The announcement on 29 Oct "Gas and Oil flow at Snapper A3" states down the bottom:
"Snapper A3 will now be tied into the nearby Snapper A1 and A2 production facilities, and is expected to be online within a month"
So hopefully (as Lower 1/3 Marg Tex) is the next deepest, that we see some news about the flow soon.
- Forums
- ASX - By Stock
- volume increasing
The announcement on 29 Oct "Gas and Oil flow at Snapper A3"...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)