"The metallurgical testwork program will be completed in two stages. The first stage will accelerate an understanding of the NSNi content (and identify any potential variation between ore zones) by utilising existing diamond drill core that was obtained from the 2021/2022 Gosling drilling program. This diamond drilling program accesses each ore zone (at depth) and will provide sample spatial representation of the second half on the mine plan. The existing core will be tested as soon as possible at the metallurgical lab between August and October 2023 with the results anticipated by late October 2023. The results will provide information on the NSNi content and the nickel recovery for each ore zone."
Will be a good start to get positive results on these tests around late October.
- Forums
- ASX - By Stock
- POS
- Volume
Volume, page-1674
-
- There are more pages in this discussion • 825 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.81M |
Open | High | Low | Value | Volume |
0.4¢ | 0.5¢ | 0.4¢ | $133.6K | 33.31M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 10739353 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 27449449 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 10739353 | 0.004 |
115 | 94689412 | 0.003 |
27 | 54044622 | 0.002 |
16 | 34412753 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 27449449 | 24 |
0.006 | 36620828 | 13 |
0.007 | 1644708 | 7 |
0.008 | 1880000 | 2 |
0.009 | 2950000 | 3 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online