Vote Teal, Indy & Green. LNP & Lab are owned by fossil fuels, page-165

  1. 4,044 Posts.
    lightbulb Created with Sketch. 92
    By the way, look how much SA are paying right now because there is no wind.
    I have a friend working on the Project Connect project which is building a 330Kv line from SA to NSW.
    This line will reduce both states power bills as it will be a direct link as now it links thru Victoria.
    The project was suppose to be commissioned in Feb this year but he is saying at least another 6 months
    Just shows the problem we are facing right now, lack of resources!
    https://hotcopper.com.au/data/attachments/6165/6165765-8f1cdf19cda2678728909274702633d0.jpg

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.