http://www.karpowership.com/en/home?v=basic
May be an option to bridge the gap between shutting coal plants and having enough batteries available for business as usual.
Tick quite a few boxes.
High efficiency, high turndown ratio Combined cycle gas or LNG fuel options
Readily available within 3-4 months for duration of 1-3 years
No capex required, pay as you go and when finished it sails away.
Up to 450MW
with capability full suite of ancillary services needed to run grid- black start, frequency and voltage control etc, plus desalinated water.
- Forums
- Commodities
- WA Coal Power Stations to Close Down
http://www.karpowership.com/en/home?v=basic May be an option to...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, CEO
Steven Gourlay
CEO
Previous Video
Next Video
SPONSORED BY The Market Online