AVL australian vanadium limited

3.25 GWh of 4-12 hour storage needed to be added in WA annually...

  1. 1,115 Posts.
    lightbulb Created with Sketch. 425
    3.25 GWh of 4-12 hour storage needed to be added in WA annually through to 2040.

    this doesn’t include microgrids or mining, only the WEM.

    AVL annual production is 1GWh.

    IMO with the Labor WA state election win even if the LNP win the federal election and delay the renewables rollout AVL could sell their entire output in WA.

    no pumped hydro in WA as the geography isn’t suitable.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $86.34M
Open High Low Value Volume
1.0¢ 1.1¢ 0.9¢ $71.80K 7.183M

Buyers (Bids)

No. Vol. Price($)
1 163643 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 13443036 32
View Market Depth
Last trade - 15.58pm 25/07/2025 (20 minute delay) ?
AVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.