Heads screwed on ! I thought they needed jobs over there....If...

  1. 25,667 Posts.
    lightbulb Created with Sketch. 273
    Heads screwed on ! I thought they needed jobs over there....

    If its being used 35% of the time or about 60 hrs a week to keep the lights on it's still needed isn't it? How much will the renewables cost to buy and build to fill that 35% gap? will it be less than $350 mil? Wouldn't it be best to keep it going and maintained until at least the renewable infrastructure is up and running and capable of delivering the 35% on demand so people can be guaranteed constant power supply through any transition?
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.