GBE 12.3% 5.0¢ globe metals & mining limited

Wa1 vs gbe, page-7

  1. 2,950 Posts.
    lightbulb Created with Sketch. 3480
    thanks for some insightful info

    So GBE is :

    193,281t Contained Nb2O5

    I recall now the source for offtake samples

    https://hotcopper.com.au/data/attachments/5693/5693787-b74d0a664a1cb775f00b3fdf40b04843.jpg

    TCM news was late october so this will likely be late nov or early dec

    Next steps
    TCM’s Stage 1 laboratory work con�nues and having produced metal chloride concentrates at lab-scale
    the next steps will be to collect the mixed chloride condensates and separate them into major
    components i.e. niobium chloride. The main target at this point is to produce niobium oxide samples for
    evalua�on by poten�al o�ake partners.
    The results of this test work will be used to design a laboratory-scale pilot plant. This plant will process
    concentrate that is currently being generated from a 10-tonne ore bulk sample collected earlier this
    year. The main purpose of the pilot plant is to obtain design parameters for the large-scale plant. Using
    these parameters, the large-scale capital and opera�ng costs can be calculated using financial modelling
    to es�mate the financial returns at different large-scale capaci�

 
watchlist Created with Sketch. Add GBE (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
-0.007(12.3%)
Mkt cap ! $34.49M
Open High Low Value Volume
5.7¢ 5.7¢ 5.0¢ $2.777K 52.00K

Buyers (Bids)

No. Vol. Price($)
1 150000 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 654251 2
View Market Depth
Last trade - 15.01pm 17/06/2024 (20 minute delay) ?
GBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.