groucho, as per the ann of 24 sept, they are sidetrack drilling from 1800m to 'just above the over pressured zone at 2568m'
Thats only a 750m sidetrack drill before wireline log data and reservoir samples are taken across the upper reservoirs.
There is no way of knowing when they actually started the sidetrack drilling either (it was probably back in late Sept or early October before the storms hit) so it really is anyones guess as to when they reach 2550m & logs and sampling are taken.
Add to My Watchlist
What is My Watchlist?