Correct me if I'm wrong here, but logging of the prospective production zone(s) would presumably be done metre by metre.
So, all things being equal, the thicker the prospective zones, the longer the logging process will take?
PS..narrow productive zones in the Cooper (typically 5m to 15m) seem to get drilled and logged in seemingly no time at all. Given the size of the target we're drilling in Block 105, I presume, time wise, were are at the opposite end of the scale.
Your expert thoughts would be appreciated.