They run different suite of logs (referred to as runs) over the open hole section (eg: from 1800 to 2500m interval).
So the first run which should b yr typical gamma-caliper-neutr-dens-res & that should give an idea of where the 'sands' are. Tie this LAS data with the logger's gas Ascii file (ROP, GAS) & u have a matchup for those 3 top payzones.
The next run could involve a MDT or RFT tool, bit slower as it records the pressure, takes fluid samples etc.
Another run for possible 'sidewall cores' if opted by ENI, to do spot porosity/permeability checks of the reservoir takes a little longer.
So 3 days should b sufficient IMHO, on a trouble free basis, for a 750-800m openhole logging run. We wait....
- Forums
- ASX - By Stock
- waiting game
They run different suite of logs (referred to as runs) over the...
-
- There are more pages in this discussion • 71 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NEN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online