I seemed that $8m was estimated for the drilling based on June Qtyly.... appeared to be more than usual if they only planning one well for production flow testing.
If the June qtyly estimated Sept qtr spending is still correct, without any drilling done so far, they should still have $5.4m in cash after subtracting the admin cost.
- Forums
- ASX - By Stock
- waiver waved
I seemed that $8m was estimated for the drilling based on June...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)