From a report on W3 in 2009. "The Warro 3 flow test program continued last week with an isolation bridge plug set above fracture stimulation zone 2, aiming to eliminate the flow of water into the well bore from the bottom of the well. Upon recommencement of flow testing after setting the bridge plug, the well successfully flowed gas for 9 hours without water infiltrating the well bore. During this period the gas flow rates were significantly higher than recorded during the flow test program to date, with an initial gas flow rate of 5.6 mmcfpd recorded 4 hours after the well was reopened (for the first four hours the separator was not in operation). " So somewhere between 2 and 5.6mmcf/d is possible imo. Anybody know what the current price of gas in WA is?
TSV Price at posting:
4.2¢ Sentiment: Buy Disclosure: Held